Procedure:Place mounting ty-wrap p.754 (2x) on support ring p.256 (2x) on counterweight p.243.1 and C-arch p.243.2Hang cables p.803 over the system and attach at the decorative hose inlet C-arch with p.754 Attention: the two high voltage cables and the two cooling hoses must be in the middle against the scale (256) , and that the knots of the tywrap pointing forward if necessary twist by hand the tywrap of the decorative hose and do this also with counterweight Remove the plastic bags and remove the plastic over the first cover